Our customers rate us 5.0 out of 5 Based on 11 Google reviews

Avis Builders and Design · Outdoor Kitchens

Outdoor Kitchens in San Jose, CA

Built-in outdoor kitchens on a real foundation, with the gas, electrical and plumbing run by the licensed trades under one contract.

  • Licensed & Bonded, CSLB #1142220
  • TREX PRO & TimberTech PRO Certified
  • Free In-Home Consultation
  • Rated 5.0 on Google

Fast & Free

Request Your Free In-Home Consultation

Rated 5.0 on Google

Why Avis Builders and Design for Outdoor Kitchens

  • Licensed & Bonded

    CSLB #1142220 · B, General Building

  • One team, start to finish

    Design, permitting and build run by the same general contractor.

  • Written scope before work starts

    You approve the itemised scope, so the job is described before it is priced.

Outdoor Kitchens across Santa Clara County and the greater Bay Area

An outdoor kitchen is a real building project, not an appliance you set on the patio. At its core it is a masonry or framed counter run built on a proper foundation, with a countertop and a set of utilities behind it: a gas line for the grill or burners, electrical for outlets and lighting, and often water and a drain for a sink. Avis Builders and Design builds outdoor kitchens for homeowners across San Jose and Santa Clara County.

We are a licensed California general contractor, CSLB #1142220, classification B general building, current and active, bonded and carrying workers' compensation coverage through the State Compensation Insurance Fund. The gas, plumbing and electrical portions are performed by the appropriately licensed trade, a licensed plumbing contractor and a licensed electrical contractor, under the general contract, with our general building license carrying the project as a whole. That framing is not a technicality. A gas line that feeds a grill has to be sized, run and pressure-tested by someone licensed to do it, the electrical has to be GFCI-protected and inspected, and a sink drain has to run to sewer rather than out onto the ground.

The counter itself is the part people picture, but the reason an outdoor kitchen lasts or fails is underneath and behind it: the slab it sits on, the utilities roughed into it, and whether those lines were run before the surrounding surface went down or cut in afterward. Rated 5.0 on Google. A consultation here starts with a walk of the actual yard, where the gas meter is, where power can come from, how the space drains, and what the ground is doing where a heavy island would land. The consultation is free and there is no estimate until someone has stood in the space. Third-party financing is available, and we offer senior and veteran discounts.

Call (408) 208-0551 free estimate.

What outdoor kitchens actually involves

An outdoor kitchen is a counter run, a foundation, and a set of utilities, and the order they go in matters more than the finish anyone sees at the end. Start with the structure of the island. It is either masonry, block or brick laid up and faced, or a framed box built from steel studs and cement board and then clad. Either way it is heavy, and heavy things want a foundation that does not move.

The Santa Clara Valley is full of expansive clay, the kind of soil that takes on water in January, swells, then shrinks back through a dry September. A masonry island set on a patio slab that was poured for foot traffic, or worse on pavers over loose base, rides that movement and eventually cracks along the counter or pulls away from the wall it sits against. The island wants a reinforced slab or footing sized for its weight, set so water drains away from it rather than collecting under it.

Read more

That is why an outdoor kitchen is easiest to build while the ground around it is still open rather than dropped onto a finished surface. The second thing that decides how the job goes is the utilities, and this is where the licensing matters. Our classification is B general building. The gas, the electrical and any plumbing are performed by the appropriately licensed trade under the general contract, and the reasons show up in the work itself.

A gas line to a grill or a burner has to be sized for the appliance load, run in the correct material, and pressure-tested and inspected, and that is a licensed plumbing contractor's work, permitted. The electrical for outlets, lighting and any powered appliance has to be GFCI-protected because it is outdoors and near water, and that is a licensed electrical contractor's work, also permitted. If the kitchen has a sink, it needs a water supply and a drain, and the drain has to go to the sewer, not out onto the ground, which is again a licensed plumbing contractor under permit.

A general contractor carrying an outdoor kitchen coordinates those trades and stands on the permit for the whole project, and that is exactly how we run it. Anyone offering to run a backyard gas line themselves without a plumber and without a permit is offering you a problem that surfaces during an inspection or a home sale. Sequencing is the practical heart of the job. The conduit and the gas and water lines are roughed in while the ground is open and before any surface goes over them, then the island foundation is poured, then the island is built and the utilities are stubbed up into it, then the appliances, counter and cladding go on.

Retrofitting utilities into a finished patio means cutting the surface back open, trenching, and patching, and a patch in concrete or pavers rarely disappears. If an outdoor kitchen is anywhere in your plan, even a year out, it is worth roughing the lines in while the ground is open. Cover and shade change the build more than they look like they should. A grill throws heat, and it needs clearance from any combustible material above it, so putting a cooking station under a wood pergola is not automatic.

Depending on the appliance and the clearance, that can mean a non-combustible section over the grill, a taller structure, or a solid roof detailed for it. A cover over a cooking area also affects ventilation, because a built-in grill under a solid roof is a different situation from one in the open air. These are design decisions, and they get made before the pergola posts are set, not after. Weather and materials are the last structural piece.

The Bay Area delivers most of its rain inside a few months and then goes dry and bright, and an outdoor kitchen has to take both. Stainless steel for the doors, drawers and appliance housings holds up where painted or mild steel rusts. A natural stone counter wants to be sealed, and the whole island wants to drain rather than hold water in a low spot where it sits through the wet season. Countertop choice is a real decision outdoors: natural stone, tile and poured concrete each behave differently in sun and rain, and the one that looks right in a showroom is not always the one that survives a west-facing yard.

We would rather be blunt in the consultation about what each surface asks of you afterward. Permitting is part of the job. An outdoor kitchen that combines gas, electrical and a sink pulls a building permit and the associated trade permits, and the work is inspected in stages. An address inside San Jose city limits is permitted through the city building department, while an unincorporated address goes through Santa Clara County, and the two do not run the same counter or the same submittal requirements.

Gas and electrical work is inspected regardless, and building past a stage the inspector has not seen is how a project stalls and how work gets torn back open. The permit is also the only point where a third party checks the gas and the electrical on your behalf, which on utilities like these is worth having.

How to decide what you need

Start with where the utilities can actually come from, because that shapes the whole layout more than the appliance list does. Walk the yard and find the gas meter, the electrical panel, and the nearest place a water and drain line could reach. An island placed on the far side of the yard from all three is not impossible, but every foot of trench for gas, power and plumbing adds cost and disturbance, and the drain in particular has to fall the right way toward the sewer.

A kitchen planned near the house, near the existing services, is usually the more sensible build. If the spot you want is far from everything, that is worth knowing before the design is drawn, not after. Decide early whether this is a full kitchen or a grill station, because the two are different projects. A built-in grill on a counter with a couple of outlets and some lighting needs gas and electrical. Add a sink and it needs water and a drain and a licensed plumbing contractor for both.

Read more

Add a refrigerator, a side burner and task lighting and the electrical load grows. Each addition is reasonable, but each one adds a trade, a permit line and a rough-in, so it is better to name everything you might want at the consultation and let the plan carry it, even if you build in stages. Roughing in a stub for a future sink while the ground is open costs very little. Adding it after the concrete is down means opening the concrete.

Be deliberate about cover and sun. A cooking area in full afternoon sun in a west-facing San Jose yard gets used in the evenings unless it is shaded, and a grill under a cover has clearance and ventilation requirements that a grill in the open does not. If a pergola or roof is part of the picture, say so before the island foundation is designed, because a structure overhead lands on posts and footings that have to be sized for it, and that is far cheaper to plan once than to add later.

Take the foundation seriously even though it is the part nobody sees. A masonry island is heavy, and on the expansive clay under most yards here it wants a proper reinforced slab or footing rather than a patio pad poured for foot traffic. When you compare bids, ask what the island sits on, how the gas and electrical are run and by whom, whether the sink drain goes to sewer, and who pulls the permits.

A bid that skips the permit or waves off the licensed trades is cheaper for a reason, and the reason is the part you cannot see once the cladding is on. Ask for the CSLB license number and check it on the state's license lookup, including whether the classification fits the work and whether the bond and workers' compensation are current. Ours is CSLB #1142220. Finally, think about sequencing. If a deck, a pergola, a cabana or a fire feature is anywhere in the plan, the outdoor kitchen belongs in that same conversation.

Footing locations and the gas, water and electrical runs are all easier to plan once than to retrofit, and a surface laid with a future kitchen in mind carries the stubbed-in utilities under it at very little extra cost.

Our Process: Outdoor Kitchens

The Avis Builders and Design Outdoor Kitchens process

Every outdoor kitchens job runs the same four stages.

  1. Step : 01

    Free in-home consultation

    We come to the property, walk the yard, and find where the gas, power, water and drain can reach. How you want to cook and gather, where the sun falls in the afternoon, how the ground drains, and what the soil is doing where a heavy island would land all get looked at in person. No estimate is issued from a satellite photo.

  2. Step : 02

    Design and layout

    The island layout, counter run, appliance positions and any sink get drawn, along with any pergola or cover over the cooking area and how the kitchen sits on the existing patio or deck. This is the stage to change your mind, because after the foundation and rough-in start, a change means undoing work you have already paid for.

  3. Step : 03

    Utilities and materials scope

    What the gas line feeds and how it routes, the electrical circuits and outlets, whether a sink adds water and drain, and the surfaces: island structure, countertop material, cladding and any cover. The licensed plumbing contractor and electrician who will perform the gas, water and electrical are set here, because their rough-in has to be planned before the surface goes down.

  4. Step : 04

    Permit submittal

    Drawings go to the City of San Jose building department, or to Santa Clara County for unincorporated addresses, or to the relevant city for other jurisdictions we serve. The building permit and the gas, electrical and plumbing trade permits are pulled together so the rough-in inspections line up with the build.

  5. Step : 05

    Build and staged inspections

    The foundation, utility rough-in, island, counter and appliances go in, with the inspector seeing the gas and electrical rough-in before it is covered and the foundation before the surface is placed. The site is kept contained rather than left open across the yard.

  6. Step : 06

    Final walkthrough and handoff

    We walk the finished kitchen with you, confirm the gas and electrical passed inspection, cover the care the chosen countertop and surfaces actually need outdoors, and hand over the permit final along with the labor warranty on the workmanship.

Real Reviews

What our customers say

Wonderful company that helped build a railing on our deck. Shay, from Avis Builders and Design, was prompt, answered all my many, many questions, and helped to create a wonderful final product. Everything was explained well and the price was very reasonable. I cannot recommend them enough!

Kate Ortiz · Google review

We recently hired Avis Builders and Design to make long needed repairs and restore the finish on our redwood deck. Everything went smoothly from start to finish. Project manager Shay assessed the job and made sure all our questions were answered and needs met for a fair price. Oscar and crew mate were on time, courteous, and efficient and completed the work as outlined in our contract. Very happy we chose Avis to do the job. Definitely recommend Avis Builders.

Karen H. · Yelp review

We contacted Avis Builders and Design because we wanted to remodel several areas of our home, including the kitchen, bathrooms, flooring, painting, and a few other updates throughout the house.

Shay was great to work with from the beginning. He explained everything clearly, helped us understand our options, and made the whole process feel much more organized. There were a lot of details to figure out, but Shay helped coordinate everything, including the design side and communication with the engineer when needed.

The team did a great job, paid attention to the details, and we're very happy with how everything turned out. We would definitely recommend Avis Builders and Design to anyone looking for a reliable remodeling contractor.

Nelson Alvarado · Google review

Read all reviews on Google

FAQs

Frequently asked questions: Outdoor Kitchens

Do I need a permit for an outdoor kitchen in San Jose?

If it involves gas, electrical or a plumbed sink, yes. An outdoor kitchen that combines a gas line, outdoor circuits and a drain pulls a building permit and the trade permits that go with it, and the work is inspected. An address inside city limits is permitted through the San Jose building department, while an unincorporated address goes through Santa Clara County. We handle the submittal and meet the inspector at the rough-in and final stages, so the permit is not something you are left managing. A contractor offering to skip it on gas and electrical work is offering you a problem that surfaces at inspection or during a home sale.

Can you run a gas line to my backyard grill?

Yes, through a licensed plumbing contractor under our general contract. Our classification is B general building, and gas work is performed by the appropriately licensed trade, permitted and pressure-tested. A gas line to a grill or burner has to be sized for the appliance load, run in the correct material, and inspected. That is not a place for a shortcut, and it is not something to run yourself without a permit. As the general contractor we coordinate the licensed plumbing contractor, carry the permit, and stand on the project as a whole.

Can you build an outdoor kitchen on my existing patio?

Yes, and the thing to settle up front is what it takes to reach the utilities. The gas, water and electrical belong in the ground before a surface goes over them, and the island wants a footing sized for its weight rather than a pad poured for foot traffic. Where the ground is still open, the utilities rough in once. Cut into a finished patio, the same work means trenching through the surface and patching it, which is slower, costs more, and rarely comes back looking untouched. If a kitchen is even a possibility a year out, it is worth roughing in the stubs before any new surface goes down.

What countertop holds up outside in the Bay Area?

It depends on how much upkeep you want to do and how much sun the counter takes. Natural stone looks the part and is durable, but it wants to be sealed to shrug off stains and weather. Tile handles heat and sun well and lets a cracked piece be replaced, though the grout needs attention. Poured concrete gives one continuous surface and can be sealed, but like any concrete it can develop hairline cracking. The Bay Area pattern of a wet winter and a long dry, bright summer is hard on an unsealed surface, and a dark counter in a west-facing yard runs hot in the afternoon. We talk through what each material asks of you before you choose, rather than after.

Can you build an outdoor kitchen under a pergola or cover?

Yes, and the cover changes the build rather than just adding shade. A grill throws heat and needs clearance from anything combustible above it, so a cooking station under a wood pergola is not automatic. Depending on the appliance and the clearance, that can mean a non-combustible section over the grill, a taller structure, or a solid roof detailed for it, and a built-in grill under a solid roof also raises ventilation. Those decisions get made in design, before the pergola posts are set, because the posts and footings have to be sized to carry the cover. Planned together with the kitchen, it is straightforward. Added over a finished island later, it is not.

Who builds outdoor kitchens in the Bay Area?

Avis Builders and Design, working from San Jose across Santa Clara County and the wider Bay Area, under CSLB #1142220, classification B general building, current and active, bonded, with workers' compensation coverage through the State Compensation Insurance Fund. Our classification is general building, and the gas, electrical and plumbing on an outdoor kitchen are performed by the appropriately licensed trade, a licensed plumbing contractor and a licensed electrical contractor, under the general contract and under permit.

That is the legally correct way for a general contractor to carry this work and the safe way to run gas and outdoor electrical. Ask any contractor you are considering for a license number and run it on the state's license lookup before work starts. Check that the status is active, that the classification fits the work, that the bond and workers' compensation are current, and that the name on the license matches the name on the contract. Ours is CSLB #1142220.

Where We Work

Serving Santa Clara County and the greater Bay Area

Get Started Today

Ready to Start Your Outdoor Kitchens Project?

CSLB #1142220 · Free In-Home Consultation · San Jose, CA

Call Now · (408) 208-0551