THE PROJECT
About this project
- Bathtub removed
- Plumbing upgrades
- New walk-in shower with a shower door
- Old sink replaced with a storage vanity
- New bathroom flooring
- Fresh paint
This bathroom remodel began with a simple change: replacing the old bathtub with a walk-in shower. That change became the starting point for a refreshed bathroom with more practical storage and a new look.
Our team removed the bathtub, upgraded the plumbing, and built a new walk-in shower with a shower door. We also replaced the old sink with a vanity, adding space to store everyday bathroom essentials.
New flooring throughout the bathroom and fresh paint brought the space together. From the shower conversion to the added storage, each part of the remodel helped turn Peter’s existing bathroom into a more useful, updated space.
MORE PROJECTS
More projects

Chandelier Bathroom Remodel
A bathroom built around a chandelier above a freestanding tub, with a custom vanity and a walk-in shower behind black grid glass.
View the project
Vita Bella Bathroom Remodel
A blue bathroom with flowing marble-look tile, a sculptural vessel sink on a floating vanity, and a frameless shower door.
View the project
Custom Vanity Bathroom Remodel
A full bathroom remodel with a custom double vanity, a tall storage cabinet, and a shower set behind a tiled pony wall.
View the projectYOUR NEXT STEP
Ready to start your project?
Tell us what you have in mind, and we’ll come to your home to talk through how to build the room around it.




